武義東陽大堂展廳地坪***400-0709-910(請撥打400-0709-910電話,永堅地坪公司)
切割和填補,對于不規(guī)則裂縫及伸縮縫先用切割機沿裂縫及伸縮縫的走向切成“V”型口,并將“V”型后內(nèi)全部清理干凈;然后用毛刷將環(huán)氧底涂在清理干凈后的“V”型口內(nèi)涂刷,形成滲透;然后用攪拌均勻的環(huán)氧砂漿將“V”型口填補平整,保持整個地坪一體;待環(huán)氧砂漿固化后,用毛刷涂施環(huán)氧底涂,對補縫進行再次滲透;
待環(huán)氧砂漿及補縫底涂完全固化后,進行**打磨工序。
2.封閉:環(huán)氧砂漿自流平地面嚴禁踩踏,且有一定的硬化期。所以必須封閉,嚴禁非自流平人員進入,用鋼管將樓梯口封閉,并懸掛禁止通行。
3. 環(huán)氧底涂施工: 檢查基層處理是否達到要求,在涂施底涂前清理干凈地面粉塵;采用滾筒或毛刷在基層地面上均勻、普遍涂施底涂材料,形成環(huán)氧底涂層。使環(huán)氧樹脂滲透到基層混凝土中,并與之形成牢固的粘結,為其之上的其它工序施工提供良好的界面。環(huán)氧底涂;將A 組分環(huán)氧樹脂底涂材料(大桶20kg)材料和B 組分固化劑材料(小桶10kg)混合一起攪拌5-10 分鐘形成環(huán)氧底涂材料。
4. 環(huán)氧砂漿的拌制:將A 組分環(huán)氧樹脂中涂材料(大桶20KG)材料和B 組分固化劑材料(小桶)混合一起攪拌5-10 分鐘,再按1:0.7 的比例加入工業(yè)砂和膩子的混合物攪拌5-10 分鐘,形成環(huán)氧砂漿材。
5.環(huán)氧砂漿施工:砂漿施工采用推刀進行刮平。環(huán)氧砂漿具有粘結強度好、高強高韌性和高抗沖擊性的特點,其目的是為環(huán)氧面涂及整個環(huán)氧地坪系統(tǒng)提供性能優(yōu)良的基層,同時對地面有找平作用。檢查底漆是否表干,判斷環(huán)氧砂漿施工是否具備條件。
6.環(huán)氧膩子施工:環(huán)氧砂漿干燥后,采用砂漿打磨機打磨環(huán)氧砂漿層,先粗后細,然后用吸塵器**徹底吸盡打磨殘留物,為環(huán)氧膩子層提供合格作業(yè)面;
環(huán)氧底漆上的膩子施工無此道工序。對于較差部位應加刮環(huán)氧膩子。后道環(huán)氧膩子施工應在前道膩子表干后進行。施工時隨時感應地面平整狀況,并通過手法隨時控制找平地面。
7.環(huán)氧面涂施工
涂施均勻、表面顏色均勻,用量控制得當。將邊角及顏色分隔部位粘貼美紋膠帶以保持直線。面涂采用帶齒的推刀刮平。
環(huán)氧面涂的目的是提供滿足功能要求和顏色要求的使用面層。施工前應檢查環(huán)境是否符合環(huán)氧面涂施工要求,采取措施防止環(huán)氧面涂施工時粉塵(包括夏季蚊、蠅)等污染物對環(huán)氧面涂的污染。采取遮擋、粘貼等方法防止環(huán)氧面涂施工對現(xiàn)場其他成品及設備的污染。
質(zhì)量要求
(一) 顏色一致、均一,無明顯色差,無漏光現(xiàn)象;
(二) 漆膜不得有以下明顯缺陷:起皮、縮孔、氣泡、小顆料、滾筒毛、裂紋、漏底;
(三) 陰陽角、倒角等復雜地形的處理,不能有遺漏及不平整現(xiàn)象,尤其各門口不能有堆積現(xiàn)象,門的開閉不會劃傷環(huán)氧面層;
(四) 施工現(xiàn)場干凈整潔:把灑落油漆、配漆的操作場所和超出施工范圍的涂層清理干凈,施工所使用的膠帶、報紙、壓條及其它廢棄物處理干凈。
五、應注意的質(zhì)量問題
(一) 環(huán)氧砂漿起泡:進行施工前必須對地面的含水率進行測試,含水率is an epoxy floor surface materials, the use of two-component epoxy coating color containing flux, there is a very good dust, chemical resistance, durability, ease of maintenance, bright colors and other characteristics, more suitable for use in any color of the warehouse renovation old ground, more suitable for use in ground anti-acid and other chemicals, can withstand a variety of mechanical rolling of the vehicle, due to the relatively rich epoxy paint colors, we can be . For Epoxy construction must be strict quality control, do a good job from the source, in order to protect flooring project quality.
Epoxy primer has good adhesion, very easy to penetrate into the concrete surface, concrete surface plays a sealed, sturdy base effect, the epoxy coating has a partial closure of the concrete surface leveling and trachoma role, epoxy coated with good abrasion and chemical resistance.
1, before Epoxy construction preparation
Epoxy construction is completed after the start of the concrete, so before the floor construction must strictly control the moisture content of the ground, the general control of 8%, but also to ensure hardness; in addition, before construction required thorough degreasing dirt.
2. Epoxy construction program
① for completion of the new concrete floor, if there is salt on the phenomenon, should be supplemented by acidification;
② exists on the old concrete floor, application-specific grinding machine or sandblasting machine, the damaged or loose concrete floor laitance or loose layer polished off, and then clean up;
③ the use of two-component epoxy primer / sealer, wool brush with scrubbing brush or concrete floor surface evenly brushing twice, dry for 12 hours;
④ increase with quartz sand using epoxy coating, with a batch of knife primed surface twice batch coating, the trachoma and pits sealed conc